Menu Close

Construction

Projects – Construction

alba interchange exhibit

LANDSCAPE WORKS FOR AL AREEN DEVELOPMENT

Client Main Contractor Year Duration Location
Al Areen Investment Co. Nass Landscapes Co. W.L. L 2018 7 Months Sakhir, Bahrain
  • Removal and re-installment of existing paving.
  • Installation of Irrigation System.
  • Installation of Landscape lighting.
  • Planting of Palms, Trees, Shrubs, Hedges and Groundcovers.

BAHRAIN BAY PUBLIC REALM FOOD & BEVERAGE OUTLETS

Client Main Contractor Year Duration Location
Bahrain Bay Development B.S.C Nass Contracting Co. W.L.L 2018 11 Months Bahrain Bay

The Park is proposed to be Soft and Hard Landscapes area, with 9 single story F&B units contained within six precast buildings, plus one public toilet complete with safe pedestrianized access walkways, children’s playground and toilet facilities. The Warf will consist of Waterside development incorporates a mixture of 14 F&B units at ground floor level, opening on to quayside promenades with additional dining ‘Pods’, which cantilever over the water.

Round about 18 project

Client Consultant Main Contractor Contract Type Duration Location
Ministry of Municipalities Affairs and Urban Planning Parsons Global Services Limited Nass Contracting Co. W.L.L Lumpsum 7 Months Sheikh Khalifa Bin Salman Highway newly Built Interchange 2 adjacent to Hamad Town Roundabout 18.
  • Hard, Soft Landscape and Irrigation works at Interchange No. 2 Link BTW RA 8.1 to 13.
  • Construction of 400M3 capacity Irrigation water storage tank and Pump Room.
  • Inlet and Outlet chambers and its associated fittings.
  • Irrigation control System, includes the Solenoid Valves, Control cable and controllers

Hunaniyah Plantation Project Landscaping and Irrigation Services- Zone B Phase 1 & 2

Client Consultant Main Contractor Contract Type Duration Location
Tatweer Petroleum Landscape Solutions Consultancy WLL Ahmed Mansoor AL A’ali Lumpsum 11 Months Tatweer Petroleum- Riffa Valley

Large Park with Lakes and Walkways.

American University of Bahrain Project

Client Consultant Main Contractor Contract Type Duration Location
Bareeq Al Retaj Real Estate Services W.L.L Gulf House Engineering Nass Contracting Company W.L. L Lumpsum 8 Months Riffa

Soft Landscaping and Irrigation Works.

REFURBISHMENTS OF BLOCKS B, C, D OF THE CROWNE PLAZA HOTEL

Client Main Contractor Year Duration Location
The Crowne Plaza Hotel, Bahrain Nass Contracting Company W.L. L 2017 3 Months The Crowne Plaza Hotel, Bahrain

Removal of existing Landscape works together with design, supply and installation, testing and commissioning of Landscape works.

LANDSCAPING TO PRIMARY INFRASTRUCTURE CORRIDORS AT DIYAR AL MUHARRAQ (SOUTH ISLAND)

Client Main Contractor Year Duration Location
Diyar Al Muharraq W.L.L HAJ Quantity Surveyors SPC 2019 6 Months Diyar Al Muharraq (South Island)

Execution, completion and defect remediation of Landscaping to the Primary Infrastructure within the South Island.

AMAS STP SEWAGE PLANT & SCREENING HILL LANDSCAPING & IRRIGATION WORKS CONTRACT NO- SP/04/B-1

Client Main Contractor Year Duration Location
WABAG BELHASA JV WLL Nass Landscapes Co. W.L. L 2018 7 Months Al Madina Al Shamaliya

The works comprise the supply and installation of Soft Landscaping and Automatic Irrigation system

Japanese Garden Project

Bahrain-Japanese Friendship Garden, Al Areen Wildlife Park for GPIC